FRP Installer Accreditation Exam

To become a Tank Solutions accredited tank installer, read the installation manual, then answer every question below. You need 90% to pass. Pass and your Certificate of Completion is issued straight away, valid for three years.

2. Your details

Your certificate shows your name, company and email exactly as you enter them here.

3. Accreditation exam

22 questions. Choose one answer for each.

  1. Failure to follow the installation instructions will void the tank warranty and may cause tank failure, serious personal injury, or property damage
  2. Who is responsible for complying with all safety precautions, codes and regulations?
  3. All available lifting lugs must be used when raising the tank
  4. Tank Solutions tanks must be installed using either pea gravel or crushed stone as backfill
  5. What is the maximum percentage (%) of backfill material which may pass through a 2.36mm sieve?
  6. Backfill should be sized between
  7. The minimum depth of the excavation can be determined by
  8. Tanks subjected to traffic loads in a dry hole must have a cover depth of at least
  9. Tanks subjected to traffic loads and high water, you should contact Tank Solutions prior to installation.
  10. What is the maximum burial depth of cover over the top of a tank?
  11. In stable soil conditions, where shoring is not required to maintain a vertical wall from top to bottom of the excavation, what is the minimum spacing required between the sidewall or endcap of the tank and the side of the excavation?
  12. In multiple tank installations, the minimum spacing between tanks must be equal to
  13. To evenly distribute buoyancy loads, all hold down straps should be tightened:
  14. When installing a tank in a dry hole, how thick should the approved backfill bedding be under the tank:
  15. When performing a wet hole installation, ballast in the tank must never exceed the water level in the hole
  16. The tank should always be secured using guy ropes during lift & placement
  17. Never pressurise a wet interstitial space.
  18. When installing PV vents to a tank compartment
  19. Whose responsibility is it to select a thread sealant that is compatible with the product being stored?
  20. The final Diameter reading should be taken
  21. After subtracting the final deflection reading from the original reading, the deflection must be compared to the table of Maximum Allowable deflections on the Installation Checklist
  22. The preferred method of installing additional Tank Solutions tanks at an existing location involves installing the new tank in a separate hole. How far from the original hole?